Search EPA NEPA Compliance Documents
NEPA Details
Title
Community Grant for Millerstown Borough, PA - Secondary Water Supply Source ProjectDocument Number
N2026147Document Type
CATEXProject Description
The objective of this proposed project is to establish a reliable secondary water source that will strengthen Millerstown Boroughs water system and ensure continuity of service under all operating conditions. The proposed secondary water supply source project components include well drilling; pump installation; water main distribution installation; disinfection treatment system installation; access road improvements; electrical improvements; and connection to the existing water main. Millerstown Borough currently relies on a single well to supply potable water to its residents, businesses, public facilities, and critical infrastructure. This sole water source presents a significant vulnerability, as there is currently no backup system in place to provide water in the event of an emergency. The Borough previously had a secondary well, but it was decommissioned due to inadequate yield and regulatory requirements. By adding a secondary water source, the Borough will enhance water infrastructure resiliency, reduce risk of service disruptions during power outages or environmental hazards, and keep the water system in regulatory compliance.EPA Region/Headquarters Office
3State or Territory
PAPoint of Contact
Paul Sobchenkosobchenko.paul@epa.gov
Date of Issuance
2026-05-13 00:00:00.0You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
NEPA Document(s):Millerstown Borough PA - CATEX Review Form - signed.pdf (7 pp, 359.7783203125 K)
Millerstown Well Siting Map EMB.pdf (1 pp, 3069.939453125 K)
Millerstown Borough EPA CDS Workplan (updated January 2026).docx