Search EPA NEPA Compliance Documents
NEPA Details
Title
City of Metropolis Well Improvements Project - Community GrantDocument Number
N2025356Document Type
CATEXProject Description
The proposed project involves construction of a new well (well #9) located on the plot at the southeast corner of Pearl St. and West 3rd St. in Metropolis, IL. The proposed well will utilize a pump capable of 1400 GPM with a 125 Hp motor. The well will be constructed to an estimated total depth of 525, with a 16 steel casing and an 8 discharge line. A 20 x 12 structure will be constructed to house the new wellhead to provide access for maintenance, testing and operation while protecting the piping from the elements with a mini-split heating and cooling system The project will also involve upgrades to wells #6 and #7 to allow for a pump waste feature to prevent any sand or turbidity from being sent to the treatment plant. These upgrades will involve the expansion of existing well vaults to 6 by 8 to accommodate the actuators.EPA Region/Headquarters Office
5State or Territory
ILPoint of Contact
Ryan Hamilton312-353-5498
hamilton.ryan@epa.gov
Date of Issuance
2025-08-05 00:00:00.0You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
NEPA Document(s):Signed City of Metropolis CATEX Letter August 2025.pdf (2 pp, 240.1943359375 K)
Signed City of Metropolis CATEX Review Form August 2025.pdf (8 pp, 311.10546875 K)
Species List_ Southern Illinois Sub-Office.pdf (11 pp, 356.23828125 K)
SHPO_Approval.pdf (1 pp, 306.3798828125 K)