Search EPA NEPA Compliance Documents

NEPA Details

Title

Gardner MA FY2023 Community Grant for Water Transmission Main Project Environmental Determination

Document Number

N2024291

Document Type

CATEX

Project Description

The City is seeking federal funds through an EPA Community Grant to install approximately 2,200 linear feet of new 16-inch ductile iron transmission main from the Crystal Lake Water Treatment Plant (WTP) to the James Street water storage tanks. This project replaces an existing 16-inch diameter cast iron transmission supply main installed in the 1880s. The transmission mains will be installed along James Street and Heywood Street. The new ductile iron water main will install gate valves that will allow for a shut-down of the transmission main during emergencies and for maintenance and repair. The existing cast iron transmission supply main will be abandoned in place. The Project is a critical piece of infrastructure in getting treated drinking water to customers and maintaining needed fire flows in Gardner.

EPA Region/Headquarters Office

1

State or Territory

MA

Point of Contact

Eric Stack
617-918-1405
stack.eric@epa.gov

Date of Issuance

2024-10-15 00:00:00.0

Website



NEPA Document(s):

Gardner MA CATEX Att 1.pdf (2 pp, 917.4755859375 K)

Gardner MA CATEX Cover Letter Signed.pdf (2 pp, 277.1337890625 K)

Gardner MA CATEX Signed.pdf (5 pp, 896.5107421875 K)