Title
Categorical Exclusion For the City of Tacoma Central Treatment Plant Electrical Distribution System Replacement ProjectDocument Number
N2020006Document Type
CATEXProject Description
The project will repair, replace, and rehabilitate the entire 15 kilovolt (kV) Medium Voltage (MV) electrical distribution system at the Central Treatment Plant in the City of Tacoma, Washington. It will build over 3,000 lineal feet of concrete encased reinforced duct bank, install over 20 miles of electrical cables, construct a 3,400 square foot building for protecting and operating the new electrical equipment, and install a new 15-kV switchgear comprised of 41 circuit breakers. Some of the existing reinforced concrete duct banks will be reused, but all the MV feeder cables will be replaced. This project will also modify the local electric utility's transmission overhead lines and support poles.EPA Region/Headquarters Office
OWState or Territory
WAPoint of Contact
Alaina McCurdy202-564-6996
Mccurdy.Alaina@epa.gov
Date of Issuance
2020-04-29 00:00:00.0Website
https://www.epa.gov/wifiaYou will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
NEPA Document(s):Tacoma NEPA CATEX_042720.pdf (5 pp, 357.6396484375 K)