Search EPA NEPA Compliance Documents

NEPA Details

Title

Borough of Califon Railroad Avenue/Main Street Stormwater Improvements

Document Number

N2015036

Document Type

EA/FONSI

Project Description

Construction of the proposed stormwater improvements project requires three major components to improve the quality of receiving waters and to increase the groundwater recharge within the project area: 1) Replace the existing antiquated stormwater piping and open channel system extending from Main Street to the natural stream channel on the recently acquired mitigation tract. 2) Construction of a stormwater conveyance relief pipe along Main Street parallel to the existing system of culverts to provide additional capacity to the discharge point at Mill Street, and 3) Construction of mini-diversions from existing tributary rivulets for infiltration and recharge trenches throughout the mitigation tract. Mini-diversions will have sediment traps to reduce sediment load to improve water quality. Mini-diversions are to direct the overbank flows from the rivulets to recharge trenches.

EPA Region/Headquarters Office

2

State or Territory

NJ

Point of Contact

Grace Musumeci
212-637-3738
musumeci.grace@epa.gov

Date of Issuance

2014-11-10 00:00:00.0

Website



NEPA Document(s):

Califon_Fonsi_EA.pdf (27 pp, 6989.40625 K)