Search EPA NEPA Compliance Documents
NEPA Details
Title
LBJ Incoming Sewer LinesDocument Number
N2015026Document Type
CATEXProject Description
Approximately 930 feet of the existing Coastal interceptor interior, connecting sewer laterals, and three associated manholes from the LBJ Pump Station to the tie-in point will be internally cleaned and then inspected using a camera/television system. Approximately 3,160 feet of the Christiansted interceptor interior, connecting sewer laterals, and 12 associated manholes from the LBJ Pump Station to the Christiansted Harbor Seaplane Base will be internally cleaned and then inspected using a camera/ television system. If the inspection shows pipeline or manhole interior conditions with problematic defects and structural deficiencies, trenchless technology(s) will be used for sectional pipeline rehabilitation.EPA Region/Headquarters Office
2State or Territory
VIPoint of Contact
Grace Musumeci212-637-3738
musumeci.grace@epa.gov
Date of Issuance
2015-04-24 00:00:00.0You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
NEPA Document(s):LBJ_Pump_Station_Catex.pdf (4 pp, 989.8447265625 K)