Environmental Impact Statement (EIS) Database
EIS Details
EIS Title
Cedar Port Navigation District Channel Deepening Project, Baytown, TexasEIS Number
20240200Unique Identification Number
Document Type
DraftFederal Register Date
2024-11-08 00:00:00.0EIS Comment Due/ Review Period Date
2024-12-23 00:00:00.0Amended Notice Date
Amended Notice
Supplemental Information
Issuance of Notice of Intent to Prepare an EIS:
2023-09-22 00:00:00.0EPA Comment Letter Date
State or Territory
TXLead Agency
U.S. Army Corps of EngineersContact Name
Christopher B. FordContact Phone
409-766-3079Rating (if Draft EIS)
As of October 2018, EPA discontinued the use of ratings for Draft EISs.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
Appendix C Engineering.pdf (1142 pp, 121483.9208984375 K)
Appendix A NOI Comments.pdf (39 pp, 884.44921875 K)
Appendix B Economic Report.pdf (45 pp, 2051.9892578125 K)
Appendix D Dredged Material Management Plan.pdf (52 pp, 6251.375 K)
Appendix E Cost Engineering.pdf (65 pp, 11337.396484375 K)
Appendix F Environmental Consequences and Regulatory Compliance Final.pdf (475 pp, 38455.4970703125 K)
Appendix G HTRW Assessment.pdf (933 pp, 76746.419921875 K)
Appendix H Real Estate Plan.pdf (43 pp, 2317.66015625 K)
Cedar Port Channel Deepening Draft Integrated FS and EIS.pdf (147 pp, 21239.7158203125 K)