Environmental Impact Statement (EIS) Database

EIS Details

EIS Title

Link Union Station Project Draft Environmental Impact Statement / Supplemental Environmental Impact Report

EIS Number

20240112

Unique Identification Number

Document Type

Draft

Federal Register Date

2024-06-21 00:00:00.0

EIS Comment Due/ Review Period Date

2024-08-09 00:00:00.0

Amended Notice Date

Amended Notice

Supplemental Information

Issuance of Notice of Intent to Prepare an EIS:

2016-05-31 00:00:00.0

EPA Comment Letter Date

2024-08-09 00:00:00.0

State or Territory

CA

Lead Agency

California High-Speed Rail Authority

Contact Name

Stefan Galvez-Abadia

Contact Phone

916-324-1541

Rating (if Draft EIS)

As of October 2018, EPA discontinued the use of ratings for Draft EISs.



Check the reCAPTCHA to download documents.

EIS Document(s):

001_Environmental Impact Statement Supplemental Environmental Impact Report_Volume I Cover.pdf (1 pp, 308.79296875 K)

002_Environmental Impact Statement Supplemental Environmental Impact Report_Title Page.pdf (1 pp, 175.712890625 K)

003_Environmental Impact Statement Supplemental Environmental Impact Report_Signature Page.pdf (1 pp, 145.9111328125 K)

004__ES.0 Executive Summary.pdf (124 pp, 2229.294921875 K)

005_TOC.pdf (26 pp, 760.17578125 K)

006_1.0 Purpose and Need.pdf (24 pp, 2492.3408203125 K)

007_2.0 Alternatives and Design Options Considered.pdf (94 pp, 20789.6005859375 K)

008_3.0 Affected Environment and Environmental Consequences.pdf (2 pp, 87.76953125 K)

009_3.1 Introduction to the NEPA Analysis.pdf (22 pp, 2068.03125 K)

012_3.4 Visual Quality and Aesthetics.pdf (78 pp, 18780.80078125 K)

013_3.5 Air Quality and Global Climate Change.pdf (42 pp, 18517.90234375 K)

014_3.6 Noise and Vibration.pdf (88 pp, 7593.443359375 K)

015_3.7 Biological and Wetland Resources.pdf (22 pp, 1048.4306640625 K)

016_3.8 Floodplains, Hydrology, and Water Quality.pdf (42 pp, 1185.83984375 K)

010_3.2 Land Use and Planning.pdf (46 pp, 3924.44140625 K)

011_3.3 Transportation.pdf (78 pp, 3538.771484375 K)

044_Appendix I - Natural Environment Study (Minimal Impacts)_Part 2.pdf (86 pp, 85134.978515625 K)

017_3.9 Geology, Soils, and Seismicity.pdf (24 pp, 688.4306640625 K)

018_3.10 Hazardous Waste and Materials.pdf (50 pp, 3220.369140625 K)

019_3.11 Public Utilities and Energy.pdf (36 pp, 625.2431640625 K)

020_3.12 Cultural and Paleontological Resources.pdf (120 pp, 9993.7490234375 K)

021_3.13 Economic and Fiscal Impacts.pdf (18 pp, 453.5859375 K)

022_3.14 Safety and Security.pdf (36 pp, 1623.4833984375 K)

023_3.15 Socioeconomics and Communities Affected.pdf (74 pp, 2877.5517578125 K)

024_3.16 Cumulative Effects.pdf (100 pp, 2310.1767578125 K)

025_4.0 Environmental Justice.pdf (82 pp, 5185.365234375 K)

026_5.0 Section 4f.pdf (82 pp, 8157.2783203125 K)

027_6.0 Other NEPA Considerations.pdf (4 pp, 152.4501953125 K)

028_7.0 Supplemental EIR.pdf (258 pp, 7071.8642578125 K)

029_8.0 Public and Agency Outreach.pdf (26 pp, 505.859375 K)

030_9.0 List of Preparers.pdf (10 pp, 155.8740234375 K)

031_10.0 References.pdf (12 pp, 205.28515625 K)

032_Environmental Impact Statement Supplemental Environmental Impact Report_Volume II Cover.pdf (1 pp, 334.453125 K)

033_Environmental Impact Statement Supplemental Environmental Impact Report_Volume II Title Page.pdf (1 pp, 255.84375 K)

034_Environmental Impact Statement Supplemental Environmental Impact Report_Volume II Table of Contents.pdf (1 pp, 98.1162109375 K)

035_Appendix A - NEPA Noticing and Scoping Summary Reports.pdf (428 pp, 63790.1591796875 K)

036_Appendix B - NEPA Alternatives Evaluation Memorandum and Engineering Plans.pdf (120 pp, 16175.5263671875 K)

037_Appendix C - Rail Planning Technical Memorandum.pdf (78 pp, 4767.341796875 K)

038_Appendix D - Community Impact Assessment.pdf (338 pp, 26548.630859375 K)

039_Appendix E - Traffic Impact Assessment.pdf (1398 pp, 33781.6640625 K)

040_Appendix F - Visual Impact Assessment.pdf (110 pp, 21118.494140625 K)

041_Appendix G - Air Quality and Global Climate Change Assessment and Health Risk Assessment.pdf (346 pp, 64648.9287109375 K)

042_Appendix H - Noise and Vibration Study.pdf (338 pp, 16489.4404296875 K)

043_Appendix I - Natural Environment Study (Minimal Impacts)_Part 1.pdf (46 pp, 88937.87890625 K)

045_Appendix J - Drainage and Water Quality Technical Reports.pdf (248 pp, 27721.0595703125 K)

046_Appendix K - Preliminary Geotechnical Report.pdf (350 pp, 57635.8408203125 K)

047_Appendix L - Hazardous Waste Impacts Technical Memorandum.pdf (66 pp, 4551.63671875 K)

048_Appendix M - Cultural Resource Reports_Part 1.pdf (606 pp, 106916.93359375 K)

049_Appendix M - Cultural Resource Reports_Part 2.pdf (582 pp, 105029.1474609375 K)

050_Appendix N - Paleontological Identification Report and Paleontological Evaluation Report.pdf (74 pp, 3234.2431640625 K)

054_Appendix R - Coordination and Outreach Plans.pdf (160 pp, 13293.8251953125 K)

051_Appendix O - Economic and Fiscal Impact Assessment.pdf (52 pp, 1690.716796875 K)

052_Appendix P - Relocation Impact Report.pdf (336 pp, 81112.8701171875 K)

053_Appendix Q - Environmental Evaluation of Malabar Yard Mitigation.pdf (694 pp, 65485.5830078125 K)

055_Notice of Availability (6-14-24).pdf (3 pp, 177.669921875 K)

Comment Letter(s):

2024_08_09_EPA_Comments_Link_US_DEIS.pdf (2 pp, 259.5673828125 K)