Environmental Impact Statement (EIS) Database
EIS Details
EIS Title
Blue Water Offshore Port Deepwater Port ApplicationEIS Number
20210162Document Type
DraftFederal Register Date
2021-10-29 00:00:00.0EIS Comment Due/ Review Period Date
2021-12-13 00:00:00.0Amended Notice Date
Amended Notice
Supplemental Information
Issuance of Notice of Intent to Prepare an EIS:
2019-07-03 00:00:00.0EPA Comment Letter Date
2021-12-13 00:00:00.0State or Territory
TXLead Agency
U.S. Coast GuardContact Name
Ken SmithContact Phone
202-372-1413Rating (if Draft EIS)
As of October 2018, EPA discontinued the use of ratings for Draft EISs.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need help accessing these PDF documents, please contact NEPAdatabasesupport (NEPAdatabasesupport@epa.gov) for assistance.
Check the reCAPTCHA to download documents.
USCG MARAD Bluewater SPM Project DEIS REV1 10.30.21.pdf (686 pp, 17263.533203125 K)
Appendix T - Offshore Oil Spill Model Set-Up and Results.pdf (120 pp, 64929.0966796875 K)
Appendix S - Vessel Traffic Collision Allision Assessment.pdf (133 pp, 22438.8720703125 K)
Appendix R - USCG Independent Risk Assessment.pdf (98 pp, 5690.1279296875 K)
Appendix Q - Applicant's Onshore Spill Modeling Report.pdf (513 pp, 65896.73828125 K)
Appendix P - Air Emissions Calculations for Construction and Operation.pdf (73 pp, 4410.427734375 K)
Appendix O - Land Use Map Series for the Proposed Project.pdf (69 pp, 54183.64453125 K)
Appendix N - Oil and Gas Wells Map Series for the Proposed Project.pdf (4 pp, 5151.8505859375 K)
Appendix M - NRCS Soils Map Series for the Proposed Project.pdf (68 pp, 35475.064453125 K)
Appendix L - Storm Surge Hazards Maps for the Proposed Project.pdf (6 pp, 4360.462890625 K)
Appendix K - Wetlands and Waterbodies Map Series for the Proposed Project.pdf (69 pp, 20408.9892578125 K)
Appendix J - Conceptual Mitigation Plan.pdf (11 pp, 3817.78125 K)
Appendix I - List of Potential Drilling Fluids.pdf (17 pp, 752.2939453125 K)
Appendix H - BWTT's Offshore Pipeline Construction Preliminary Vessel Anchoring Plan.pdf (8 pp, 399.9072265625 K)
Appendix G - Best Management Practices.pdf (87 pp, 26052.0 K)
Appendix F - Essential Fish Habitat Assessment.pdf (221 pp, 34391.212890625 K)
Appendix E - Biological Assessment.pdf (421 pp, 90580.4541015625 K)
Appendix D - Agency Correspondence.pdf (517 pp, 26925.123046875 K)
Appendix C - Comments On The Draft EIS.pdf (2 pp, 140.650390625 K)
Appendix B - Scoping Report.pdf (103 pp, 14025.6865234375 K)
Appendix A - Port Operations Manual.pdf (2 pp, 137.62109375 K)
DIA para el Proyecto Bluewater SPM - Resumen Ejecutivo.pdf (32 pp, 989.708984375 K)
Comment Letter(s):20210162 BLUEWATER PORT DEEPWATER PORT APPLICATION DRAFT EIS MARAD-USCG 2021 EPA COMMENTS.pdf (6 pp, 127.212890625 K)